Cobra Situation Updates

Cobra Situation Updates

Cobra Situation Updates. By 2012Portal.

Clicks on the Ads Keep Us Alive 🙂

Cobra Aggiornamento Situazione

Apr 25 2020

URGENT EXIT protocol fully enforced

Cobra Aggiornamento Situazione

Apr 19 2020

Systems security breach at 504

VTX metastable, CONPLAN approved and operational

L50 L50 intrusion, evaluate CONPLAN

Black VTXC alert at 504

Cobra Aggiornamento Situazione

Apr 10 2020

Top domain parameter secure, evaporation sequence

Cobra Aggiornamento Situazione

Apr 5 2020

GR+, GR++

Cobra Aggiornamento Situazione

Apr 1 2020

State Of Mission Report March 2020

Pandora in progress, ongoing gamma grid ratio disruption, PBHL TOP anomaly detected. L2LSIP unstable, Project 502 on hold. Minimum M / DL / HP requirements met, VTX and SD requirements not met. Significant M insertion.

Cobra Aggiornamento Situazione

Mar 2 2020

State Of Mission Report February 2020

Pandora in progress, gamma grid ratio disruption. L2LSIP stable, Project 502 operational. Minimum M / DL / HP requirements met, VTX and SD requirements not met.

Cobra Aggiornamento Situazione

Feb 26 2020

L2LSIP stable

Cobra Aggiornamento Situazione

Feb 25 2020

L2LSIP operational, stability test

Minimum L2LSIP security requirements met, modulation in progress, P502v1.0 operational

Cobra Aggiornamento Situazione

Feb 21 2020

Project 502 modulation postponed to EOL2PSEQ

Cobra Aggiornamento Situazione

Feb 13 2020

Initialize Project 502, modulation target 200223.1433Z

Cobra Aggiornamento Situazione

Feb 1 2020

State Of Mission Report January 2020

L4 Pandora sequence in progress. GR+, exit optimization in progress. Minimum M / DL / HP requirements met, VTX and SD requirements not met.

Cobra Aggiornamento Situazione

Jan 12 2020

GR+, exit optimization

Cobra Aggiornamento Situazione

Jan 2 2020

State of Mission Report 2019

Cobra in progress, Pandora in progress, EXMOSS clear clear. Gamma timeline in progress, P501 surface filtering completed with partial grid ratio failure, leading to L0 systemic collapse expected in 20. MASTERPIECE operational, M minimum requirements met, HP requirements met, SD/VTX requirements not met.

Cobra Aggiornamento Situazione

Jan 2 2020

State of Mission Report December 2019

L4 Pandora sequence in progress. Minimum M / DL / HP requirements met, VTX and SD requirements not met.

Cobra Aggiornamento Situazione

Nov 12 2019

P501 merged into MASTERPIECE

Cobra Aggiornamento Situazione

Oct 4 2019

VTXC grid recovery, RM2m L0 MASTERPIECE sequence initialized

Cobra Aggiornamento Situazione

Oct 3 2019

VTXC Grid Collapse 

Cobra Aggiornamento Situazione

Oct 1 2019

State of Mission Report September 2019

EXMOSS clear clear, MOSS Pandora sequence in progress. Project 061 downgraded, project 501 to merge into MASTERPIECE at ST point. VTXC systems security breach, in deflection. Minimum M / DL / HP / VTX requirements met, SD requirements not met.

Cobra Aggiornamento Situazione

Sep 25 2019

Project 501 Update

All protocols clear and operational, 501/MASTERPIECE integration set at ST point.

INT YXR flow recovery almost complete, except for recent VTXC disruption which modifies YXR protocols (VTX.1 downgrade).

Project 310 aborted and project 061 downgraded due to unfavorable grid ratio.

Reactivate PT intersection protocols after ST point.

End of coding for 501.

Sep 25 2019

Cobra Situation Updates

Project 061 downgraded and integrated into VTXC due to unfavorable grid ratio

Sep 1 2019

State of Mission Report August 2019

EXMOSS Pandora sequence in progress. Project 310 total abort due to security breach, systems security breach recovery in progress. Minimum M / HP / VTX requirements met, SD requirements not met, DL requirements not met.

Aug 28 2019

Cobra Situation Updates

Security breach at 310, project permanently aborted.

Aug 17 2019

Cobra Situation Updates

Systems security breach at 504.

DNit Telegram Channel

Aug 3 2019

Project 501 Update

VTXPOS requirements are strictly enforced, leading to n=5. Surface filtering complete, FLT.exe flow active.

INT YXR flow recovery almost complete, ANT INT multiphasic interference almost removed, surface GDS coding partial recovery.
Projects 310 and 061 integrated into project 501.
All 501 protocols are nearing completion, 501/MASTERPIECE integration delayed due to unfavorable grid ratio, PT intersection on hold.
Evaluation expected 190921.

Cobra Situation Updates

Cobra Situation Updates – Thursday, August 1, 2019

State Of Mission Report July 2019

EXMOSS Pandora sequence in progress, N22 downgraded to N20. Project 501 final integration into MASTERPIECE delayed due to unfavorable grid ratio, internal YXR flow / multiphasic recovery (n=3) almost complete. Drastic VTXC/Systems security breach, recovery in progress, PB recovery failure. Minimum M / HP / VTX requirements met, SD requirements not met.

Cobra Situation Updates

Cobra Situation Updates – Tuesday, July 23, 2019

Security breach deflected, sublunar EELA in position

Cobra Situation Updates

Cobra Situation Updates – Saturday, July 20, 2019

VTXC/Systems security breach at 504

Cobra Situation Updates

Situation Updates – Monday, July 1, 2019

State Of Mission Report June 2019

EXMOSS Pandora sequence in progress, cosmic rootkit detected, removal in progress, N22 detected, removal in progress. Project 501 final integration into MASTERPIECE in progress, internal YXR flow / multiphasic recovery in progress, PB recovery failure. Minimum M / HP / VTX requirements met, SD requirements not met.

Cobra Situation Updates

Situation Updates – Sunday, June 23, 2019

Systems alert downgrade to yellow.

Cobra Situation Updates

Situation Updates – Tuesday, June 18, 2019

Systems alert upgrade to red.

Cobra Situation Updates

Situation Updates – Monday, June 17, 2019

Systems alert downgrade to yellow.

Cobra Situation Updates

Situation Updates – Sunday, June 16, 2019

Systems alert upgrade to red.

Cobra Situation Updates

Situation Updates – Wednesday, June 12, 2019

Systems security breach at 504

Cobra Situation Updates

Situation Updates – Sunday, June 2, 2019

Project 501 Update

VTXPOS requirements are more strictly enforced, total surface scanning and filtering in progress, limiting towards full INT YXR flow recovery.

Projects 310 integrated into project 501, project 061 in progress. DL niche almost complete AN integration, AN INT multiphasic interference clearing in progress.

Surface GDS coding complete failure / collapse, abort project except for VTXC, surface triangulation almost non existent.

PT intersection on hold.

Evaluation expected 190715.

Flower Of Life

Cobra

Operation Omega Phoenix

Cobra

Galactic Super Wave

Cobra

Terms of Surrender

Cobra

Mystery Schools

Cobra

The Veil

Cobra

Galactic Superwave

Cobra

Cobra Situation Updates

2012 Portal 

AN Conversion

ATVOR Technology

Cintamani Grid Guidelines

Cobra

ATVOR Technology

Cobra

The Fall of the Archons

Cobra

The Galactic Codex

Cobra

The Chimera Group

Cobra

Earth History

Cobra

Clicks on the Ads Keep Us Alive 🙂

Pills Disclosure News Italia

Wise Men

Wise men speak because they have something to say; Fools because they have to say something.

Plato

  • 2020 Server Cost Support - 3200 € 72% 72%

Web Hosting

Support Disclosure News Italia

We are working hard, and every day, to keep this blog. Like you we are fighting for the truth. If you want to work with us you are welcome, please email us! The blog costs are at our expense, advertising reimburse us very marginally so if you like our work and find it useful buy usacoffee clicking the donation button below that will directu to your PayPal. We need the help of people like you!

 





Bitcoin & Cryptocurrencies Donation

1M9dohWnHBwNLSPd6afRaJackrw6wK9bxY

Pin It on Pinterest